How smart planning sets your project up to succeed

Planning rarely follows a straight line. Policy changes, technical requirements evolve, consultees raise new issues and client briefs move. Smart planning isn't about trying to predict every problem before it happens. It's about understanding a site well enough to know what matters, what can change and where there is room to negotiate. At The Noble Consultancy, that means bringing planning and design thinking together early. By testing planning, design and technical requirements through the layout, we can understand their implications for development potential, viability and deliverability, and find solutions while there is still room to influence the outcome.

Posted by Toby Eichler 10 minutes ago

Test before you commit

Before committing to a site, a developer needs to understand not only what might constrain development, but what the site is realistically capable of delivering.

Planning policy, access, drainage, levels, ecology, landscape, heritage and utilities can all influence the developable area and ultimately value of the site. But simply identifying those constraints isn’t enough.

The important part is understanding how they interact and what that means for the development proposition.

Through feasibility layouts and capacity testing, we can explore different approaches, test house type ranges where appropriate and understand how planning and technical requirements affect a site’s potential.

The aim is to ensure commercial decisions are based on a tested proposition, rather than an assumed site capacity that may prove difficult to achieve.

Establish the right planning strategy

There isn’t one planning route that’s right for every site. The strategy needs to reflect the characteristics of the site, the nature of the proposals and what needs to be established at each stage.

For some sites, outline permission may be the appropriate way to establish the principle and parameters of development while retaining flexibility over the detail. For others, a detailed application may provide a more effective route. We also regularly become involved where outline permission already exists and the opportunity lies in reviewing what has been established and improving what comes next.

The important thing is understanding what needs to be resolved now, what can sensibly remain flexible and where there may still be scope for negotiation.

That could mean challenging assumptions, testing capacity, responding to emerging policy or revisiting density, housing mix or the masterplan as the scheme evolves.

An existing consent should provide a framework for development, not necessarily limit the opportunity to explore a better solution.

Know what to negotiate

Early engagement with the local planning authority can be invaluable, but it needs to have a clear purpose.

Pre-application discussions aren’t simply about asking the council what it wants and designing accordingly. They provide an opportunity to test the planning and design approach, understand the authority’s position and identify where there is agreement, where further work is needed and where there may be a case to challenge or negotiate.

There will inevitably be competing requirements. Planning policy, placemaking, highways, drainage, landscape and other technical considerations all have to work alongside the commercial realities of delivering a development.

Bringing planning and design together allows us to test the consequences of those requirements through the layout, informed by a thorough understanding our clients’ brand, product and aspirations. This allows us to assess how a change could affect capacity, character, viability and deliverability before deciding how best to respond.

Keep the scheme moving as requirements change.

An outline consent establishes a framework for development. It doesn’t design the scheme.

At Reserved Matters, the detail has to work. Layout, scale, appearance, landscape and access have to come together with the technical requirements of the site and the commercial objectives of the development.

And even at this stage, things change.

Consultees can raise new issues, policy can evolve and a client’s brief can move. Requirements that appeared straightforward at outline stage can have wider implications once they are tested against the layout and developers product.

Smart planning is being able to respond without losing sight of the fundamentals of the scheme.

Sometimes that means redesigning. Sometimes it means negotiating. Sometimes it means demonstrating that another solution delivers the right outcome.

The key is understanding the implications before simply accepting that something has to change.

Be prepared to revisit the approach

Our work at Gibraltar Farm in Gillingham is a good example.

The site already had outline consent and an extant Reserved Matters application for 450 homes when we became involved. Rather than defaulting to the previous proposals, we went back to first principles and tested different ways of approaching the site.

The brief then changed following Barratt’s acquisition of Redrow, creating a dual-brand Barratt and Redrow development. We explored different layout options before developing one coherent masterplan that responded to the commercial and design requirements of both brands while creating distinct character areas.

Alongside this, we undertook a detailed local character assessment and worked through pre-application discussions, design workshops, Design Review Panel engagement and a Building for a Healthy Life assessment with local planning authority officers.

During the application, Medway Council sought the implementation of an emerging policy requirement for Nationally Described Space Standards. We worked through the implications with the authority and negotiated how the requirement could be implemented across the scheme.

This ultimately redesigned all 450 plots, whilst retaining the structure of the layout developed through the design workshops, within the existing programme, while retaining the 10.62 hectares of open space and maintaining the design quality.

Drainage requirements also increased from those envisaged at outline stage. Working alongside the engineering and landscape teams, seasonal SuDS basins were integrated into the open-space strategy, while continuing to work through the LPA’s expectations for greater variety and character using the client’s standard house types.

The scheme received Reserved Matters approval at planning committee on 29 July 2026.

Gibraltar Farm demonstrates the importance of being able to revisit a scheme, understand the implications of changing requirements and develop solutions that respond to both planning and commercial objectives. It also shows why planning, design and technical considerations need to be considered together, rather than addressed in isolation.

Being open to change doesn’t mean simply accepting every new requirement. It’s about understanding what is being asked, knowing what to negotiate and finding a solution that works for the scheme without losing sight of what you’re trying to achieve. 

Planning a site?

Whether you’re assessing a site before acquisition, reviewing an existing consent or dealing with an issue that’s emerged during the planning process, the key is understanding what it means for the scheme and finding the right response.

If you’ve got a site or scheme that’s proving difficult, talk to us. We’re here to help.

 

Read the blog

All posts

Noble News

The plan ahead for The Noble Consultancy

For nearly 30 years, The Noble Consultancy has helped housebuilders and developers navigate planning, design and technical challenges. This year marks an exciting new chapter for the business. Toby Eichler and Nathan Taylor, who together bring more than 50 years of industry experience and have spent 35 years at The Noble Consultancy, are now leading the company.

Planning approval

The site that said no from every angle

The Noble Consultancy has just helped Taylor Wimpey Bristol finally secure detailed planning consent on 2nd July 2026 for 90 new homes, plus outline consent for a care home and employment use.

Top
PDF